Construction in Auromode going against the NGT ruling.
A transformer house is being build in Auromode at the side towards Sunlit future / Mukti accounting.It is going to be a transformer house for the HT transformer. Road service is digging the trenches to bring the HT cable from the Mangalam radial ( near Darkali) to Auromode. The RA selected TDC has asked to see the NOC, but so far no NOC has been provided. This construction and the laying of the cable is against the NGT ruling.